Ongoing Projects
-
CRISTAL
From 01 September 2022
to 31 August 2025Focusing on the development of IWT and its infrastructure, the projects aims to create an innovative technology for the monitoring and digitisation of transport chains,
-
MERLIN
From 01 October 2021
to 31 March 2026Mainstreaming ecological restoration of freshwater-related ecosystems in a landscape context: innovation, upscaling and transformation.
-
PLATINA4Action
From 01 January 2024
to 31 December 2026PLATINA4Action promotes IWT in Europe through coordination and support activities, focusing on green and connected IWT, evaluating NAIADES III, and preparing a policy agenda.
-
MOMMA – Moselle for the Multimodal Mobility of the Army
From 01 October 2023
to 30 December 2027French MOMMA Project, co-financed by CEF, aims to upgrade the entire canalised Moselle, from Nancy to the Luxembourg border.
-
FAIRway Danube II
From 01 April 2023
to 31 December 2027Innovative measures towards rehabilitation, modernization and climate proofing of the Danube fairway
-
DANUBE4all
From 01 January 2023
to 31 December 2027Restoration of the Danube River Basin for ecosystems and people from mountains to coast
-
Upgrade of Gambsheim lock
From 01 March 2020
to 31 December 2027Tackling a bottleneck in river navigation and in access to large ports for countries along the Rhine (Germany, France and Switzerland).
-
Renovation and upgrade of Royers Lock (Antwerp)
From 01 October 2021
to 31 December 2027The Royers Lock project creates additional capacity for the passage of inland vessels in the Port of Antwerp, to solve a bottleneck from the Albert Canal to the Scheldt river.
-
COMEX² – River Information Services Corridor Management Execution²
From 01 February 2023
to 29 February 2028Future-proofing RIS for cross-border inland waterway transport in Europe.
-
SUNDANSE
From 03 June 2024
to 02 June 2028The SUNDANSE project, within the EU Mission “Restore our Ocean and Waters”, surveys the configuration & dynamics of the Danube with the research vessel REXDAN.
-
ResiRiver
From 01 July 2023
to 30 June 2028The Interreg Resilient River (ResiRiver) project focuses on the creation of Resilient River Systems through the mainstreaming and upscaling of Nature-based Solutions (NbS). In North-West Europe, river systems are facing…
-
IWT Projects website
From 02 December 2024
to 31 December 2030The Inland Waterway Transport (IWT) Projects Cooperation Platform provides an overview of Research, Development, and Innovation (RD&I) projects in IWT.
-
Elbe-Vltava Waterway
From 01 January 2008
to 31 December 2030The Elbe-Vltava waterway is the most important waterway in the Czech Republic, the only waterway link with North Sea and Baltic ports, and part of TEN-T.