Ongoing Projects
-
Platina 3
From 01 January 2021
to 30 June 2023PLATINA3 provides targeted coordination and support activities to promote inland waterway transport (IWT) in Europe.
-
Upgrade of Gambsheim lock
From 01 March 2020
to 11 November 2023Tackling a bottleneck in river navigation and in access to large ports for countries along the Rhine (Germany, France and Switzerland).
-
Preparing FAIRway 2
From 01 July 2020
to 30 April 2024Preparing FAIRway 2 works in the Rhine-Danube corridor aims to bring the Danube waterway infrastructure forward in an efficient, sustainable and user-oriented way.
-
Elbe-Vltava Waterway
From 01 January 2008
to 31 December 2024The Elbe-Vltava waterway is the most important waterway in the Czech Republic, the only waterway link with North Sea and Baltic ports, and part of TEN-T.
-
Renovation and upgrade of Royers Lock (Antwerp)
From 01 October 2021
to 31 December 2027The Royers Lock project creates additional capacity for the passage of inland vessels in the Port of Antwerp, to solve a bottleneck from the Albert Canal to the Scheldt river.
-
Děčín Lock
Děčín lockFrom 01 January 2028
to 31 December 2030Improving navigation conditions for freight, passenger and leisure boating on the Elbe from the Czech/German border to the end of the Děčín backwater.